Herding Cats
Hardplates
Only a few parts, not worth reassigning tools to new pockets
30 tool, 2000 Hitachi Seiki VS40 High Grade. 25/30hp 12k die and mold spindle, pallet changer, 30 tool extended chain, 300 gal coolant, bell shape accel deccel curves, and a few more options I can't think of off the top of my head. The machine was specced out to do a couple shows before it's was sold so it pretty well optioned for what it is. Max feed when running G8 is 1575 ipmHow many tools are in that chain? What machine?
That was pre-staging them. It's a fixed address so it always puts the tool back in the same pot it originally came from. It's never really an issue cause it's very rare that I only use a tool for a few seconds, plus I usually run at least 4 parts at a time.Seems like an awlfully slow TC for a machine like that. Is there no way to prestage the tool? Or is that w/prestage?